Understanding Party Wall Awards: A Complete Guide for Property Owners

Planning a renovation or construction project that involves a shared wall? A party wall award is likely a crucial legal requirement you’ll need to navigate. This comprehensive guide explains everything property owners need to know about party wall awards, from legal frameworks to practical applications, helping you avoid costly disputes and delays.

What is a Party Wall Award?

Party wall award document with official stamps and signatures

A legally binding party wall award document

A party wall award is a legally binding document drawn up by surveyors on behalf of property owners who share walls, structures, or adjacent lands. This document becomes necessary when one property owner (the building owner) plans to carry out construction work that could affect the structural integrity or stability of a shared wall or adjoining property.

The award serves as a formal agreement that outlines the scope, timing, and manner in which the proposed works will be carried out. It provides legal protection for both the building owner undertaking the work and the adjoining owner whose property might be affected.

Not sure if you need a party wall award?

Get expert advice from our specialist party wall surveyors with a free 30-minute consultation.

Get Free Consultation

The Process of Obtaining a Party Wall Award

Party wall surveyors inspecting a property and taking measurements

Obtaining a party wall award involves several key steps that must be followed in the correct order. Understanding this process is essential for property owners to avoid delays and legal complications.

1. Serving Notice

The building owner (the person planning the work) must serve written notice to all adjoining owners at least two months before the planned start date for party structure works, and one month for new boundary walls or excavation works. This notice should detail the proposed works and their potential impact.

2. Adjoining Owner’s Response

Upon receiving the notice, the adjoining owner has 14 days to respond. They can:

  • Consent to the works (in which case no award is needed)
  • Dissent and agree to the appointment of a single “agreed surveyor”
  • Dissent and appoint their own surveyor

If the adjoining owner doesn’t respond within 14 days, they are deemed to have dissented, and the dispute resolution process must be followed.

Need help with party wall notices?

Our experienced surveyors can prepare and serve the correct notices on your behalf, ensuring compliance with all legal requirements.

Request Party Wall Notice Service

3. Appointment of Surveyors

If there is dissent, both parties must appoint surveyors. These can be:

  • A single “agreed surveyor” who acts impartially for both parties
  • Two separate surveyors (one appointed by each owner)

If two surveyors are appointed, they will select a third surveyor who can be called upon if the two surveyors cannot agree or if either owner appeals against the surveyors’ decision.

4. Preparation of the Award

The surveyor(s) will:

  • Inspect both properties
  • Prepare a “schedule of condition” documenting the current state of the adjoining property
  • Review the proposed works and any potential impact
  • Draft the party wall award document
Schedule of condition document with photographs of property condition

A schedule of condition document recording the adjoining property’s state before works begin

5. Issuing the Award

Once the award is finalized, it is signed by the surveyor(s) and copies are served on both owners. The award becomes legally binding unless either owner appeals to the County Court within 14 days.

6. Commencing Work

After the award is in place and any appeal period has passed, the building owner can commence work according to the terms set out in the award.

What Does a Party Wall Award Contain?

A comprehensive party wall award typically includes the following elements:

Contents of a party wall award with architectural drawings
  • Names and addresses of all parties involved (building owner, adjoining owner, and surveyors)
  • Description of the properties and the party wall or structure
  • Detailed specifications of the proposed works
  • Timing and manner of how the work will be carried out
  • Working hours and restrictions on noisy work
  • Access arrangements for surveyors to inspect the works
  • Schedule of condition of the adjoining property before works begin
  • Protective measures to prevent damage to the adjoining property
  • Provisions for resolving disputes during the works
  • Details of any security for expenses if required

Roles and Responsibilities in the Party Wall Process

The Building Owner

As the building owner (the person undertaking the work), your responsibilities include:

  • Serving proper notice before commencing any notifiable works
  • Covering the costs of preparing the award (including surveyors’ fees)
  • Ensuring works comply with the specifications in the award
  • Repairing any damage caused to the adjoining property as a result of the works
  • Providing access to surveyors for inspections
Building owner discussing plans with a party wall surveyor

The Adjoining Owner

As an adjoining owner (whose property might be affected), your rights include:

  • Receiving proper notice before works begin
  • Appointing a surveyor (at the building owner’s expense)
  • Having a schedule of condition prepared before works start
  • Being protected from unnecessary inconvenience
  • Receiving compensation for any loss or damage
  • Requesting security for expenses in certain circumstances

The Party Wall Surveyor

The role of the party wall surveyor is to:

  • Act impartially (even when appointed by one party)
  • Prepare the schedule of condition
  • Draft and issue the party wall award
  • Resolve disputes that arise during the works
  • Inspect the works to ensure compliance with the award
  • Determine compensation for damage if necessary
Party wall surveyor examining a wall and taking notes

A party wall surveyor conducting a detailed inspection

Need a qualified party wall surveyor?

Our team of experienced surveyors can help with all aspects of the party wall process, from serving notices to preparing awards.

Find a Surveyor Near You

Common Disputes and How to Resolve Them

Despite the structured process provided by the Party Wall etc. Act 1996, disputes can still arise. Understanding common issues and their resolutions can help property owners navigate potential conflicts.

Two property owners in discussion with a mediator about a party wall dispute

Damage Claims

One of the most common disputes involves damage to the adjoining property. The building owner is legally responsible for repairing any damage caused by the works, but disagreements can arise over:

  • Whether the damage was caused by the works or pre-existed
  • The extent of the damage
  • The appropriate repairs needed
  • The cost of repairs

Resolution: The schedule of condition prepared before works begin is crucial evidence in resolving these disputes. If surveyors cannot agree, the third surveyor may be called upon to make a determination.

Cost Disputes

Disagreements about costs can include:

  • Surveyor’s fees
  • Cost of additional work required by the award
  • Compensation for loss or inconvenience

Resolution: The Act generally places the financial burden on the building owner, but surveyors can determine fair apportionment of costs in the award.

Access Disputes

The Act provides rights of access to the adjoining property when necessary, but disputes can arise over:

  • The timing and duration of access
  • The extent of access required
  • Notice periods for access

Resolution: The party wall award should specify access arrangements. If disputes arise, surveyors can issue an addendum to the award.

Construction work being carried out on a party wall with protective measures in place

Proper protective measures can help prevent damage and disputes

Deviation from the Award

If the building owner deviates from the specifications in the award, this can lead to disputes about:

  • Unauthorized additional work
  • Changes to the agreed method of working
  • Breaches of working hours or other restrictions

Resolution: The surveyors can issue an addendum to the award to cover changes, or in serious cases, the adjoining owner may seek an injunction.

Case Study: Basement Extension with Party Wall Award

Before and after images of a basement extension project requiring a party wall award

Successful basement extension project completed with proper party wall procedures

Scenario: The Smiths wanted to create a basement extension beneath their Victorian terraced house in London. The works would involve excavating 3 meters below the shared party wall with their neighbors, the Johnsons.

The Process

  1. The Smiths served a party wall notice on the Johnsons two months before the planned start date.
  2. The Johnsons dissented and appointed their own surveyor.
  3. Both surveyors conducted thorough inspections and prepared a detailed schedule of condition of the Johnsons’ property.
  4. The surveyors agreed on specific requirements for the basement works, including:
    • Sequential underpinning of the party wall
    • Installation of movement monitoring equipment
    • Restricted working hours
    • Special measures to control dust and noise
  5. A comprehensive party wall award was issued, including all engineering details and method statements.
  6. During the works, a small crack appeared in the Johnsons’ property.
  7. The surveyors inspected the damage and determined it was caused by the works.
  8. The award was amended to include repairs to the crack at the Smiths’ expense.
  9. The project was completed successfully with minimal disruption to the Johnsons.

Outcome: Despite initial concerns, the party wall award process provided a framework that protected both parties’ interests. The Smiths got their basement extension, and the Johnsons were protected from damage and unnecessary inconvenience.

“Having a proper party wall award in place saved us from what could have been a very contentious situation with our neighbors. The surveyors handled everything professionally and when an issue arose, there was already a process in place to resolve it.”

— Mr. Smith, Building Owner

Frequently Asked Questions About Party Wall Awards

Can I refuse a party wall award?

You cannot simply refuse a party wall award if the works fall under the Party Wall etc. Act 1996. However, you can appeal against an award to the County Court within 14 days of it being served if you believe there are grounds to do so. Valid grounds might include procedural errors or if you believe the surveyor has exceeded their authority.

Who pays for the party wall surveyor?

Generally, the building owner (the person undertaking the work) is responsible for all reasonable costs associated with the party wall process. This includes the fees of both their own surveyor and the adjoining owner’s surveyor. However, if the adjoining owner makes unreasonable demands or causes unnecessary delays, the surveyor might apportion some costs to them.

How long does it take to get a party wall award?

The timeframe varies depending on the complexity of the works and how quickly information is provided. At minimum, you should allow 2-3 months from serving notice to having an award in place. Simple cases might be resolved more quickly, while complex projects or disputes can take longer. It’s advisable to start the party wall process well in advance of your planned construction start date.

What happens if my neighbor ignores the party wall notice?

If your neighbor doesn’t respond within 14 days of receiving the notice, they are deemed to have dissented. You must then follow the dispute resolution procedure by appointing a surveyor on their behalf. This is a common misconception – you cannot simply proceed with the works if there’s no response. The surveyor appointed on their behalf will act impartially to protect their interests.

Can I start work without a party wall award?

Starting notifiable works without following the proper party wall procedures is not advisable. It’s a breach of the Party Wall etc. Act 1996 and can result in legal action, including an injunction to stop the works. Additionally, you would lose the protection the Act provides and could be liable for any damage caused. Always obtain the necessary party wall award before commencing notifiable works.

Property owner reviewing party wall award documents with a surveyor

Conclusion: Navigating Party Wall Awards Successfully

Party wall awards are an essential part of the construction process when working on or near shared boundaries. While they may seem complex, understanding the process and getting professional advice early can help avoid disputes, delays, and unnecessary costs.

Remember these key points:

  • Start the party wall process early – at least 2-3 months before your planned construction start date
  • Ensure notices are properly served with all required information
  • Consider using a professional to prepare and serve notices
  • Always obtain a schedule of condition before works begin
  • Follow the award’s specifications precisely during construction
  • Maintain open communication with neighbors throughout the process

By following the proper procedures and working with qualified professionals, you can ensure your construction project proceeds smoothly while maintaining good relationships with your neighbors.

Successful completion of a construction project with party wall award in place

Following proper party wall procedures leads to successful projects and good neighbor relations