Understanding Party Wall Awards: A Complete Guide for UK Property Owners

A party wall award is a critical legal document for UK property owners planning construction work that affects shared walls or boundaries. Whether you’re extending your home, converting a loft, or undertaking major renovations, understanding the party wall award process can help you avoid costly disputes and ensure your project proceeds smoothly. This comprehensive guide explains everything you need to know about party wall awards under the Party Wall Act 1996.

What is a Party Wall Award?

A party wall award is a legally binding document prepared by surveyors that sets out how building work affecting a party wall should be carried out. It protects the interests of both the building owner (the person doing the work) and the adjoining owner (the neighbour).

Party wall award document showing key sections and signatures

A typical party wall award document contains detailed conditions and requirements

Under the Party Wall etc. Act 1996, this award serves several important purposes:

  • Establishes the legal framework for the building works
  • Documents the condition of the adjoining property before work begins
  • Sets out working hours, access arrangements, and other conditions
  • Provides a mechanism for resolving disputes
  • Allocates responsibility for costs
  • Legal Tip: A party wall award is only required when an adjoining owner dissents to a party wall notice or doesn’t respond within 14 days. If they consent in writing, you can proceed without an award, though a condition survey is still advisable.

    When is a Party Wall Award Required?

    Not all building work requires a party wall award. The Party Wall Act 1996 specifies certain types of work that fall under its jurisdiction:

    Work Requiring a Party Wall Award:

  • Building a new wall on or at the boundary line
  • Cutting into a party wall to insert beams or flashings
  • Raising the height of a party wall
  • Demolishing and rebuilding a party wall
  • Excavating near an adjoining owner’s building
  • Underpinning a party wall
  • Work Not Requiring a Party Wall Award:

  • Minor repairs such as replastering
  • Drilling for fixings (shelves, kitchen units)
  • Standard electrical work
  • Installing or replacing non-load-bearing fixtures
  • Work that doesn’t affect the structural integrity
  • Construction work being done on a party wall between two properties

    Important: The Party Wall Act applies to excavations within 3 meters of a neighbouring building if the work goes deeper than the neighbour’s foundations, or within 6 meters if the excavation meets a line drawn downwards at 45 degrees from the bottom of the neighbour’s foundation.

    The Party Wall Award Process: Step by Step

    Obtaining a party wall award involves several clearly defined steps. Understanding this process helps ensure you meet all legal requirements and maintain good relationships with your neighbours.

  • Serve a Party Wall Notice
    The building owner must serve written notice to all adjoining owners at least two months before the planned start date for work to the party wall, or one month for excavations.
  • Wait for Neighbour’s Response
    Adjoining owners have 14 days to respond. They can consent to the works, dissent, or do nothing (which counts as dissent).
  • Appoint Surveyor(s)
    If there’s dissent, both parties must appoint surveyors. They can agree on a single surveyor (the “agreed surveyor”) or appoint one each, who then select a third surveyor as backup.
  • Prepare Schedule of Condition
    The surveyor(s) document the condition of the adjoining property before work begins, usually with photographs and written descriptions.
  • Draft the Party Wall Award
    The surveyor(s) prepare the award document detailing how and when the work should be carried out.
  • Issue the Award
    Once finalized, the award is served on both owners. Either owner has 14 days to appeal to the County Court if they disagree with it.
  • Commence Work
    After the award is in place and no appeals have been made, building work can begin according to the conditions set out in the award.
  • Party wall surveyor inspecting and documenting the condition of a property

    A party wall surveyor documenting the condition of a property before works commence

    Need Help With Your Party Wall Award?

    Our network of qualified party wall surveyors can guide you through the process and ensure your project complies with all legal requirements.

    Find a Party Wall Surveyor

    Key Components of a Party Wall Award

    A comprehensive party wall award contains several essential components that protect both the building owner and adjoining owner. Understanding these components helps you ensure your award is complete and legally sound.

    1. Identification Details

    Names and addresses of all parties involved, including property owners and appointed surveyors. This establishes who is bound by the award.

    2. Schedule of Condition

    Detailed documentation of the adjoining property’s condition before work begins, with photographs and written descriptions to record any existing damage or defects.

    3. Work Specifications

    Detailed description of the proposed works, often with reference to architectural drawings and structural calculations that form part of the award.

    4. Working Conditions

    Specific conditions such as working hours, noise limitations, dust control measures, and access arrangements to minimize disruption.

    5. Protection Measures

    Requirements for protecting the adjoining property during the works, including temporary supports, weatherproofing, and security arrangements.

    6. Cost Allocations

    Details of who pays for what, including surveyor fees, the cost of the award, and any compensation for temporary inconvenience or permanent damage.

    Close-up of a schedule of condition in a party wall award showing photographs and notes

    A schedule of condition with photographs forms a crucial part of the party wall award

    “A well-prepared party wall award is comprehensive and anticipates potential issues before they arise. It protects both parties and provides a clear framework for resolving any disputes.”

    — Royal Institution of Chartered Surveyors

    Rights and Obligations Under a Party Wall Award

    The Party Wall Act 1996 establishes specific rights and obligations for both building owners and adjoining owners. Understanding these helps ensure compliance and prevents disputes.

    Building Owner’s Rights

  • Right to execute the works described in the award
  • Right to reasonable access to the adjoining property if necessary
  • Right to place scaffolding on adjoining owner’s land (if specified in the award)
  • Right to reasonable use of adjoining owner’s property for temporary storage (if specified)
  • Building Owner’s Obligations

  • Must comply with all conditions in the party wall award
  • Responsible for making good any damage caused by the works
  • Must pay surveyor fees and other costs as specified in the award
  • Must provide reasonable notice before accessing adjoining property
  • Adjoining Owner’s Rights

  • Right to have property protected during works
  • Right to compensation for any damage caused
  • Right to have works carried out according to the award
  • Right to appeal the award within 14 days if dissatisfied
  • Adjoining Owner’s Obligations

  • Must allow reasonable access for works specified in the award
  • Cannot obstruct lawful works being carried out
  • Must pay own surveyor fees if they appointed their own surveyor
  • Must report any damage promptly
  • Two property owners discussing party wall works with a surveyor

    Good communication between property owners and surveyors helps prevent disputes

    Warning: Failure to comply with a party wall award can result in legal action, including injunctions to stop work and claims for damages. The courts take breaches of party wall awards seriously.

    Enforcing a Party Wall Award

    A party wall award is legally binding on both the building owner and adjoining owner. If either party fails to comply with the terms of the award, there are several enforcement options available.

    If the Building Owner Breaches the Award:

  • The adjoining owner can apply to the County Court for an injunction to stop the works
  • They can claim damages for any losses suffered due to the breach
  • They can request that the surveyors issue further awards to address the breach
  • If the Adjoining Owner Breaches the Award:

  • The building owner can seek a court order to gain access if unreasonably denied
  • They can claim damages for delays and additional costs incurred
  • They can request that the surveyors address the issue in a supplemental award
  • County Court building where party wall award appeals are heard

    Party wall award appeals and enforcement actions are heard in the County Court

    It’s worth noting that the Party Wall Act was designed to avoid litigation where possible. The appointed surveyors often play a continuing role in resolving disputes that arise during the works, potentially issuing additional awards to address new issues.

    Party Wall Award Costs

    Understanding the costs associated with party wall awards helps you budget appropriately for your project. The Party Wall Act generally follows the principle that the building owner (the person initiating the works) pays the costs.

    Cost Item Typical Range Who Pays? Notes
    Party Wall Notice £0-£150 Building Owner Can be prepared by the owner for free using templates or by a surveyor for a fee
    Agreed Surveyor £800-£1,500 Building Owner When both parties agree to use one surveyor
    Two Surveyors £1,500-£3,000 Building Owner (usually) When each party appoints their own surveyor
    Third Surveyor (if needed) £500-£1,000 Building Owner Only if the two appointed surveyors cannot agree
    Additional Site Visits £150-£250 per visit Building Owner For complex or long-running projects
    Schedule of Condition £300-£600 Building Owner Often included in the surveyor’s overall fee
    Party wall surveyor preparing cost estimates for a client

    A party wall surveyor explaining costs to a client

    Cost-Saving Tip: If your neighbour consents to the works, you can avoid the cost of a full party wall award. However, it’s still advisable to have a schedule of condition prepared to protect both parties.

    Common Mistakes to Avoid

    Many property owners encounter problems with party wall awards due to avoidable mistakes. Being aware of these common pitfalls can save you time, money, and stress.

    Property owner reviewing party wall documents with concerned expression
  • Starting work without proper notice – This can result in an injunction stopping your work and potentially costly legal proceedings.
  • Failing to identify all adjoining owners – You must serve notice on everyone with an interest in the adjoining property, including freeholders and leaseholders with leases longer than one year.
  • Using incorrect notice templates – Different types of work require different notice formats. Using the wrong one can invalidate your notice.
  • Inadequate schedule of condition – A poor or incomplete record of the adjoining property’s condition before works begin can lead to disputes about damage.
  • Ignoring the award conditions – The party wall award sets legally binding conditions. Deviating from these without agreement can lead to enforcement action.
  • Poor communication with neighbours – Many disputes arise from lack of communication. Discussing your plans informally before serving formal notices can help maintain good relations.
  • Choosing unqualified surveyors – Party wall matters require specific expertise. Using surveyors without proper party wall experience can lead to problems with the award.
  • Avoid Costly Party Wall Mistakes

    Get expert guidance from qualified party wall surveyors who can ensure your project complies with all legal requirements.

    Connect With a Party Wall Expert

    Frequently Asked Questions About Party Wall Awards

    Can I appeal a party wall award if I disagree with it?

    Yes, either the building owner or adjoining owner can appeal a party wall award to the County Court within 14 days of it being served. However, appeals are relatively rare and can be costly. The grounds for appeal are limited to errors of law or procedure, not simply disliking the decision. Before appealing, it’s advisable to discuss your concerns with the surveyor(s) as they may be able to address them without court involvement.

    What happens if my neighbour ignores a party wall notice?

    If your neighbour doesn’t respond to a party wall notice within 14 days, they are deemed to have dissented. This means you’ll need to appoint a surveyor to act for them (known as the “10-day letter” procedure) or appoint an agreed surveyor to act for both parties. You cannot simply proceed with the works without an award in place. The surveyor appointed for your neighbour will act impartially to protect their interests even without their active participation.

    Do I need a party wall award for a loft conversion?

    You will need a party wall award for a loft conversion if the work involves cutting into a party wall to insert beams or flashings, raising the height of a party wall, or other work that affects the party structure. Many loft conversions in semi-detached or terraced houses do require party wall awards. However, if your loft conversion doesn’t involve any work to the party wall itself, you may not need an award.

    Can I prepare my own party wall award without a surveyor?

    No, a party wall award must be prepared by appointed surveyor(s) under the Party Wall Act. While you can serve the initial notice yourself, the award itself requires professional expertise. If your neighbour consents to the works, you won’t need a formal award, but this isn’t the same as preparing your own award. For simple projects where both parties agree, using an “agreed surveyor” can be more cost-effective than each appointing separate surveyors.

    What if damage occurs despite having a party wall award?

    If damage occurs to the adjoining property during the works, the building owner is responsible for making good the damage or paying compensation, regardless of whether they followed the award conditions. The schedule of condition prepared before works began will be crucial in determining what damage was caused by the works. The surveyors can be called back to inspect the damage and determine the appropriate remedy or compensation. This is one of the key benefits of having a proper party wall award in place.

    How long does a party wall award remain valid?

    Once a party wall award is in place, the building owner has 12 months to begin the works described in the award. If works haven’t started within this period, a new notice would need to be served and the process begun again. Once works have started, there’s no specific time limit for completion, but significant delays or changes to the scope of works might require additional notices or awards.

    Property owners reviewing party wall award documents together

    Cooperative discussion between neighbours can help resolve party wall matters amicably

    Conclusion: Ensuring a Smooth Party Wall Process

    A party wall award is an essential legal safeguard for property owners undertaking building works that affect shared walls or boundaries. By understanding the process, requirements, and your rights and obligations under the Party Wall Act 1996, you can ensure your project proceeds smoothly while maintaining good relationships with your neighbours.

    Remember that early communication, proper notice, and professional guidance are key to avoiding disputes. While the party wall process may seem complex, it provides valuable protection for all parties involved and helps ensure that building works are carried out safely and responsibly.

    Successful completion of a home extension project following a party wall award

    Successful completion of a building project following proper party wall procedures

    Ready to Proceed with Your Building Project?

    Get expert advice from qualified party wall surveyors who can guide you through the entire process from notice to completion.

    Find a Party Wall Surveyor Today